Log Delivery and Re-Erection. What a
site to behold. Your logs arrive on a 40' flatbed semi-truck.
As will our crane and re-erection crews. We will ask that your
general contractor be on hand to be given the technical assistance and
work with us during the re-erection of your home. This process
usually takes 2-3 days depending on the size of the log structure.
Step
Nine
Dry-In Phase begins. Now you or your
contractor will take you through what we call the dry-in phase.
First will be the roof system, from the tongue and groove interior ceiling
to the exterior roof; then the doors and windows. This is the
process that will make your log shell weather tight.